I. Introduction
Gas-insulated metal-enclosed switchgear (GIS) has the virtues of small cube, long maintain periodic, few workload and reliable operation, it is greatly promoted. Because three-phase arc extinguish chamber of GIS with three poles in one enclosure is set in the same tank which is connected with air and they affect each other during breaking, the single-phase test can't verify the performances. So the three-phase test must be done.