C37.242-2021 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control | IEEE Standard | IEEE Xplore

C37.242-2021 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

Most Recent
Status: active - Approved
Versions

Abstract:

Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed ...Show More
Scope:This guide provides guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power system protection and control...Show More
Purpose:This guide is intended to be used by power system protection professionals for PMU installation and covers the requirements for synchronization of field devices and conne...Show More

Abstract:

Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) techniques focusing on the overall accuracy and availability of the time synchronization system; (c) test and calibration procedures for PMUs for laboratory and field applications; and (d) communications testing for connecting PMUs to other devices including phasor data concentrators.
Scope:
This guide provides guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power system protection and control. The following are addressed in this guide: a) Considerations for the installation of PMU devices based on application requirements and typical bus configurations. b) Techniques focusing on the overall accuracy and availability of the time synchronization system. c) Test and calibration procedures for PMUs for laboratory and field applications. d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).
Purpose:
This guide is intended to be used by power system protection professionals for PMU installation and covers the requirements for synchronization of field devices and connection to other devices including PDCs.
Date of Publication: 14 October 2021
Electronic ISBN:978-1-5044-7504-4
Persistent Link: https://xplorestaging.ieee.org/servlet/opac?punumber=9574623

Subscription Options - Standards

References

References is not available for this document.