I. Introduction
The penetration of distributed energy resources (DERs) into the distribution network (DN) can highly benefit electrical systems in terms of reliability and operation. A significant number of reported researches have focused on different methods to solve the sitting and sizing of DERs in DN [1]–[2]. They have employed heuristic methods like GA or Bee colony to solve multi-objective optimization problems applying various objective functions such as power loss reduction, voltage improvement, stability enhancement, etc. [3]–[7].