I. Introduction
Nuclear energy is one of the primary sources of power energy. Nowadays, NPP is playing a more and more important role in the power generation area. Besides, the failure of NPP can have severe consequences for society. Therefore, the reliability of NPP is crucial for power supply and social security. As a critical thermal subsystem in NPP, AHP utilizes the exhaust of the high-pressure cylinder of the steam turbine to heat the feedwater and receives the water vapor from the steam-water separation reheater to improve the efficiency of the thermodynamic cycle. To meet the required thermal performance during all operating conditions, an effective maintenance strategy needs to be scheduled for all the components in AHP. An adequate maintenance strategy helps AHP meet the required thermal performance, protect the turbine against the reverse flow of steam or feedwater, ensure forward flow to the steam generator, minimize the risks of erosion and corrosion and minimize the number of components subject to replacement.