I. Introduction
There is a widespread perception that material handling is a key component in reaching flexibility, manufacturing, energy and agility goals. The handling capacity of advanced materials is essential because without this ability of providing the material needed for the proper workstation at the right time and in the right amount, the whole plant will become “bogged down.” This makes it less efficient and thus produces less profit and / or it operates at higher costs. (Joshi & Smith, 1994).