I. Introduction
The most important factors contributing to the risk of failure for any type of organization or system are related to poor performance, time pressure, low quality and high cost. Every year there is evidence of a large number of cases where a project or an organization fails, and the consequences of those failures are sometimes fatal. Notwithstanding all the technological advances and a huge amount of risk analysis approaches, risks associated with a project or a system cannot yet be analyzed precisely and the risk analysis itself still contains high risks.