1. Introduction
This paper is motivated by the research and practice in a Mold and Die Manufacturing (MDM) company in Guangdong province, China. This research involves two related areas in the literature. They are assembly job shop scheduling, or job shop scheduling with assembly operations [1] and bilevel [2] decision structure.