Abstract:
A Management Information System has been developed and implemented using General Purpose Simulation System (GPSS)/360. The system provided the following data for a solid-...Show MoreMetadata
Abstract:
A Management Information System has been developed and implemented using General Purpose Simulation System (GPSS)/360. The system provided the following data for a solid-state production facility: 1) current location of wafers showing work orders started, total daily production, and rejects; 2) yesterday's and accumulated yield by step, and projection of number of finished wafers from this quantity; 3) location of dormant work orders, i.e., orders that had not moved for a specified time; 4) current utilization of equipment and manpower; 5) number of orders awaiting processing at each step and how long they have been waiting; 6) daily operations schedule of wafers to be processed each day according to a predetermined priority structure; and 7) delivery forecast for when orders would be shipped and how the date varies according to resources applied. The inventory status data were structured in GPSS/360 to provide a common data format for both current status and forecasting. This fully operational system was developed to satisfy specific solid-state management requirements. This system was organized in a general manner for flexibility and change and could be modified to be used as a management information system for other types of operations.
Published in: IEEE Transactions on Systems Science and Cybernetics ( Volume: 4, Issue: 4, November 1968)
References is not available for this document.
Select All
1.
Development of techniques for automatic manufacture of integral circuits, vol. 1, November 1965.
2.
Introduction to GPSS III, 1965.
3.
Introduction to GPSS/360, 1967.