Loading [MathJax]/extensions/MathMenu.js
Optimization of the germanium preamorphization conditions for shallow-junction formation | IEEE Journals & Magazine | IEEE Xplore

Optimization of the germanium preamorphization conditions for shallow-junction formation


Abstract:

Shallow p/sup +/-n and n/sup +/-p junctions were formed in germanium preamorphized Si substrates. Germanium implantation was carried out over the energy range of 50-125 k...Show More

Abstract:

Shallow p/sup +/-n and n/sup +/-p junctions were formed in germanium preamorphized Si substrates. Germanium implantation was carried out over the energy range of 50-125 keV and at doses from 3*10/sup 14/ to 1*10/sup 15/ cm/sup -2/. p/sup +/-n junctions were formed by 10-keV boron implantation at a dose of 1*10/sup 15/ cm/sup -2/. Arsenic was implanted at 50 keV at a dose of 5*10/sup 15/ cm/sup -2/ to form the n/sup +/-p junctions. Rapid thermal annealing was used for dopant activation and damage removal. Ge, B, and As distribution profiles were measured by secondary ion mass spectroscopy. Rutherford backscattering spectrometry was used to study the dependence of the amorphous layer formation on the energy and dose of germanium ion implantation. Cross-sectional transmission electron microscopy was used to study the residual defects formed due to preamorphization. Complete elimination of the residual end-of-range damage was achieved in samples preamorphized by 50-keV/1*10/sup 15/ cm/sup -2/ germanium implantation. Areal and peripheral leakage current densities of the junctions were studied as a function of germanium implantation parameters. The results show that high-quality p/sup +/-n and n/sup +/-p junctions can be formed in germanium preamorphized substrates if the preamorphization conditions are optimized.<>
Published in: IEEE Transactions on Electron Devices ( Volume: 35, Issue: 5, May 1988)
Page(s): 659 - 668
Date of Publication: 31 May 1988

ISSN Information:

No metrics found for this document.

Usage
Select a Year
2025

View as

Total usage sinceJan 2011:326
01234567JanFebMarAprMayJunJulAugSepOctNovDec160000000000
Year Total:7
Data is updated monthly. Usage includes PDF downloads and HTML views.
Contact IEEE to Subscribe

References

References is not available for this document.