I. Introduction
THE faults on the SES could be due to material casualty of individual equipment (load, cable, or generator) or widespread damage due to battle damage. For a typical zone based shipboard DC electrical distribution system, the main disturbances are the generator fault, primary DC Bus fault, rectifier fault, zone flooding, secondary DC bus fault, buck Converter fault and load damage.