Abstract:
The low-level RF (LLRF) control system for the Spallation Neutron Source has undergone some recent hardware changes. The intended field and resonance control module (FRCM...Show MoreMetadata
Abstract:
The low-level RF (LLRF) control system for the Spallation Neutron Source has undergone some recent hardware changes. The intended field and resonance control module (FRCM) design has been re-vamped to minimize functionality and ease implementation. This effort spans a variety of disciplines, and requires parallel development with distinct interface controls. This paper will discuss the platform chosen, the design requirements that will be met, and the parallel development efforts ongoing
Published in: Proceedings of the 2003 Particle Accelerator Conference
Date of Conference: 12-16 May 2003
Date Added to IEEE Xplore: 04 May 2004
Print ISBN:0-7803-7738-9
Print ISSN: 1063-3928