Abstract:
The Spallation Neutron Source (SNS) accelerator systems will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. In order to satisfy t...Show MoreMetadata
Abstract:
The Spallation Neutron Source (SNS) accelerator systems will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. In order to satisfy the accelerator systems' portion of the critical decision 4 (CD-4) commissioning goal (which marks the completion of the construction phase of the project), a beam pulse with intensity greater than 1/spl times/10/sup 13/ protons must be accumulated in the ring, extracted in a single turn and delivered to the target. A commissioning plan has been formulated for bringing into operation and establishing nominal operating conditions for the various ring and transport line subsystems as well as for establishing beam conditions and parameters which meet the commissioning goal.
Published in: Proceedings of the 2003 Particle Accelerator Conference
Date of Conference: 12-16 May 2003
Date Added to IEEE Xplore: 04 May 2004
Print ISBN:0-7803-7738-9
Print ISSN: 1063-3928
No metrics found for this document.