I. Introduction
Owing to the rigorous requirements of the dynamometer system and challenges related to installation, it is difficult and expensive to test high-power motors at full load on the test bench, especially when large-size or high-speed motors are involved [1]. Furthermore, when only one motor is available for testing due to cost considerations, classic back-to-back (BB) bench test methods become impractical.