I. Introduction
PCM simulation is an important tool to simulate the operation, and evaluate the safety, reliability, and economy for power system. PCM simulation targets at large-scale scheduling period, and is of Non-deterministic Polynomial (NP)-Hard, thus it is very time-consuming. Some simplifications are often used in PCM constraints to fasten the solving, which makes the results significantly deviate from reality. In practice, obtaining simulation results quickly and accurately is very important for timely and reasonable evaluation of the system.