I. Introduction
In order to meet the needs of sending clean energy from western hydropower bases to the power grid, improve the main grid structure in western regions, and strengthen the power supply guarantee for load centers, a plan for constructing several 1000 kV AC substations in western regions has been developed. Some of these substations are located at altitudes of up to 3700 meters, which put forward higher requirements for power equipment due to the natural conditions in high-altitude areas.