The grid characteristics significantly differ in various areas because of the broad region in China. The appropriate construction standards should b e researched according to the different supply regions. The main trans former capacity con figuration of 110~35kV substation is researched in the paper. The optimization method of main transformer capacity is proposed. The capacity optimization mathem...Show More
Middle and long term load forecasting is the essential basis for planning of distribution network. With high penetration DGs (distributed generation) integrated into network, the net load demand of HV/MV network become more complicated, load forecasting encounters greater challenge than ever. Volatility and intermittency of wind and solar power has greatly influenced the load characteristics. A ne...Show More