1. Introduction
Gas Insulated Substations have found a broad range of applications in power systems because of their high reliability, easy maintenance, small ground space requirements etc. In a Gas insulated substations very fast transient over voltages (VFTO) are generated during the switching of disconnectors in 245kV and above voltage level's GIS. VFTO generated in a GIS should be considered as an important factor in the insulation design. For designing a substation it is essential to know the maximum value of VFTO. Fast operating disconnector switches are usually used to reduce time of the breakdown, however, it can not eliminate the harm of the VFTO. Several inhibition methods are simulated in this article, which can provide the reference the for protection of VFTO.