I. Introduction
THE objective of the power system transmission network expansion planning (TNEP) problem is to obtain the optimum expansion plan, that is the transmission lines and/or transformers that must be added to a network in order to make its operation viable for a pre-defined horizon of planning, at a minimum cost [1].