I. Introduction
During 12th Plan, it is proposed to add, 100,000MW generation in the Indian Network. In addition to this about 38,400 MW is proposed to be added as backup and 2000 MW Hydro power to be imported from Neighbouring countries, Integration of such a large power into Indian Network may require new technologies to play a vital role in order to optimally utilize the existing assets and minimum investment. During 13th Plan, it is also proposed to add 100,000MW generation. In addition to this about 14,500 MW of Hydro Power import is proposed to be added.