I. Introduction
In production scheduling researches, many studies have been conducted based on an ideal mathematical formulation such as job-shop scheduling problems (JSPs) in order to minimize production time [1]. At the 26th session of the Conference of the Parties to the United Nations Framework Convention on Climate Change (COP26) in 2021, parties were asked to take ambitious actions to meet objectives of reducing global carbon dioxide emissions to net zero around mid-century [2]. Up to now, production scheduling problems considering environmental loads have been proposed by adding minimization of energy consumption and CO2 emissions to the mathematical formulations of the problems [3]–[8].