I. INTRODUCTION
Present day power system (PS) is a highly complex electrical network. It comprises of generation, distribution and transmission of the electric power. As the load differs from time to time, there is fluctuation of the tie line power and frequency. In electrical power network, frequency and tie-line power should remain within the scheduled limit for reliable power supply. Hence, it is necessary to always maintain the balance between generation and demand of the electrical power and the technique by which it is achieved is known as LFC.