1. INTRODUCTION
Unit Commitment (UC) problem is to determine most economical start-up and shutdown times for the electrical power generating units to meet a load demand while satisfying a set of operational constraints. The UC problem is a large and complex mathematical optimization with both integer and continuous variables. The exact solution to the problem can be obtained only by complete enumeration, which cannot be applied to realistic power system due to its excessive computation time requirement [1].